Speaking to reporters on the sidelines of the ANC Letsema campaign, in Philippi, on Saturday, Ramaphosa said there are various issues plaguing Eskom, including elements of sabotage.
ANC President Cyril Ramaphosa in Philippi as part of the Letsema campaign. Picture: Twitter/@AthiGeleba
CAPE TOWN – President Cyril Ramaphosa said was no time frame for when load shedding would end.
This as Eskom again implemented Stage 5 load shedding on Saturday afternoon.
Speaking to reporters on Saturday, on the sidelines of the ANC Letsema campaign, in Philippi, Ramaphosa said there were various issues plaguing Eskom, including elements of sabotage.
READ: Gordhan apologises for load shedding, again suspects possible sabotage
“There can’t be a timeframe when you are dealing with a broken system. You need to repair the broken system. It’s been so for quite a long time”, he said.
The president said Eskom’s problems were multi-faceted.
“It’s got many parts to it. It’s got skills-based to it, it’s got machines to it, flawed designs of power stations. It’s got various aspects and it’s also got an element of sabotage”, said Ramaphosa.
Building Better Communities with ANC President cde @CyrilRamaphosa #LETSEMA 🖤💚💛
📍 Philippi, Western Cape pic.twitter.com/zooYvCkdf0
‘ ATHI GELEBA 🇿🇦 (@AthiGeleba) December 10, 2022
(Except for the headline, this story has not been edited by PostX News and is published from a syndicated feed.)